Building Work to a Party Wall

Are you Planning Building Work to a Party Wall?

Are you planning building work to a party wall or structure that you share with your neighbour? Is your neighbour undertaking building work that will affect your property?

Building Work to a Party Wall Can Be a Matter For the Courts

If you are planning building work or your neighbour is proposing work that affects a party wall or party structure then there is a legal requirement to meet the provisions of the Party Wall etc. Act 1996.  If your property is in England or Wales, this legislation must be followed. The law does not apply in Scotland or Northern Ireland.

What Is a Party Wall?

A Party Wall can be defined many ways. Principally it is a wall that sits across the boundary between two or more properties, such as the dividing wall between adjoining houses. It could also be the dividing floor between flats.

The Act also protects structures that stands completely on one owner’s land. Sometimes this can be astride the line of junction and can be used by both owners. i.e. Where one owner has built a wall and the adjoining owner has built up against it enclosing the structure. In that particular example only part of that wall might be considered a ‘party wall’.

Properties that are completely independent of one another can also be subject to the Act. If a building owner is planning to undertake excavations up to 6 metres from an adjoining owners structure there may also be a requirement to adhere to the Act.

A ‘party fence wall’ is a wall that does not form part of a building and stands on land belonging to different owners. This could be a garden wall, but does not include a timber fence.

There are many instances where the Party Wall Act may or may not be relevant. For this reason we always recommend it is assessed by a professional to assist, who both knows the workings of the Act and has technical construction expertise.

Does the Party Wall Act Apply To Me?

Providing the structure or structures in question meets the definitions within the Party Wall Act there is ikely to be a requirement that works need to be agreed with the adjoining owner. Simple works, such as installing shelves, replacing electrical sockets or wiring, does not require an agreement. But you should only do certain building work to a party wall or party structure once the adjoining owner or owners have been formally notified in writing and agreed the works in advance of works proceeding. Examples of notifiable party wall work might include ork includes:

  • Cutting into a wall to take the weight of a beam or insert a flashing.
  • Inserting a damp proof course.
  • Demolition, reconstruction or underpinning a party wall.

If you’re planning to undertake excavations there are some comprehensive requirements defined within the Party Wall Act, that need to be properly understood to determine whether the Act applies.

When Does Party Wall Notice Need To Be Served?

If you are planning to undertake building work to a Party Wall then we suggest you inform your neighbour in good time. This is the most critical step and can often prevent unnecessary and costly dispute later on. The purpose of the Act is to avoid disputes arising by making sure owners are aware and agree the Party Wall works.

Where applicable you must notify your neighbour in writing before building work to a party wall begins. There is a minimum period for this notice to be served before building works affecting the party wall or structure can commence. If there is more than one person with an interest in the property (i.e. Leaseholders and Freeholders. Again these are clearly defined in the Act) you must notify all of them. If there are multiple properties affected they must all be notified.

The Act is specific about the requirements of issuing notice/s. It is very important that valid notice or notices are served. If notices are not valid they will need to be served again correctly and this will reset the minimum period.

What Happens If An Adjoining Owner Does Not Agree to Party Wall Works?

If an adjoining owner does not agree to works then a dispute is deemed to have arisen. Parties in dispute are not able to act as a surveyor for themselves . They need to appoint someone who can act independently. Owners may agree to appoint a single ‘agreed surveyor’, or they can each appoint their own surveyor to act upon their behalves. The expert or experts will agree the parameters of how the works should be carried out and will serve a ‘party wall award’ which will stipulate how works affecting the party structure will be completed.

The award usually contains a schedule of condition of the affected elements of the adjoining owner’s property before work begin. This provides an accurate record of the condition of the building prior to works so damage (if any) can be properly defined after works have been completed.

RMA Surveyors are Chartered Building Surveyors, Members of the Royal Institute of Chartered Surveyors. We are experts in party wall matters. If you need advice in relation to the Party Wall Act contact us for clear and reliable advise.

Party Wall Notice

Being unaware of a duty to serve Party Wall Notice under The Party Wall etc. Act 1996 is not a defence. Some people do not factor in the costs of compliance with The Party Wall etc. Act 1996 before they commence works. Some choose to ignore the legislation, in the belief they are saving themselves time and money. This incorrect course of action leads to delays to their project, neighbourly dispute, possible court action and associated costs.

Party Wall Notice will prevent court action

The Requirement For Party Wall Notice

The Party Wall etc. Act 1996 requires Building Owners to serve relevant party wall notice to Adjoining Owners up to 2 months before notifiable works commence. When party wall notice is not served and it can cause friction between neighbours. In the worst case scenario where works have begun Adjoining Owners can apply to the Court and gain an injunction against the works. There are upfront costs for doing this, which are usually recoverable from a Building Owner. What Building Owners can also overlook by neglecting to serve notice is that certain rights granted by the Act are also not invoked (such as access in their neighbour’s land, to undertake notifiable works).

In many cases serving party wall notice is simple. By notifying a neighbour that works are going ahead there is less likelihood of a dispute occurring. Issuing notice/s with a polite letter explaining what the works are is far cheaper and easier than a court injunction and costs, then living with the resulting bad feeling.

Ignorance Is No Defence

The Party Wall etc. Act 1996 is now well established legislation. There is no good reason to ignore it. The courts will invariably find against anyone who does, either wilfully or through genuine ignorance. The cost of not serving a valid party wall notice may prove to be the costliest oversight of the whole project. The adage of Ignorantia iuris nocet applies. Not knowing the law is harmful.

We Can Help

If you are having works undertaken to your property that is likely to affect your neighbour’s property contact RMA Surveyors Ltd and we will be pleased to assist you serving the correct notice to avoid future and costly disputes. RMA Surveyors Ltd are members of the RICS. Please contact us and we will be happy to help.

Six Steps to a Party Wall Award

Party wallRecently we have had a number of requests for information regarding party wall procedure. With the aim of providing guidance the following is an overview of the basic procedure of serving Party Wall notices:

1. Firstly, do you need to issue a party wall notice? For the sake of argument let’s say you do. Do you know what type of notice needs to be served? A line of junction notice? A party structure notice? Or a notice of adjacent excavation? In some cases it may be just one in some cases it may be all three. This can easily be determined by any good Party Wall Surveyor who knows the Party Wall Act.

2. Secondly, on whom are you serving notice? Who is the freeholder? Are there any leaseholders? Does the proposed work affect more than one structure? If so, there are likely to be a number of parties to whom notice must be served.

3. With the aforementioned identified notice can be served. RMA Surveyors Ltd are often asked to become involved in Party Wall matters after notice has been served. Clients sometimes see an early saving being made by not appointing a Party Wall Surveyor, as the process seems simple at the outset. However, as the process develops it can become more complex and Building Owners seek to appoint Party Wall Surveyors to untangle the knots. We would say two things at this juncture. Firstly, fees for initial notice are usually minimal. Secondly, issue of the correct, properly drafted notices at the outset will save time. If a notice is not correct, it is invalid and another valid notice must be served. It can take two months before works can start from date of issue of a valid notice.

4. Valid notice is served to the Adjoining Owner. They now have fourteen days to respond. The adjoining owner can assent or dissent to the proposed works. If the adjoining owner does not respond in this period, works are deemed to be in dispute. If the Adjoining Owner agrees to works, the Building Owner may, by written agreement, proceed with works. We strongly recommend a condition survey of the Adjoining Owner’s property be undertaken prior to works commencing, to provide a benchmark and avoid later dispute.

5. If no response is received or the Adjoining Owner dissents to works the building owner will need to write to the adjoining owner to request they appoint a Party Wall Surveyor. The Adjoining Owner may opt to use the Surveyor appointed by the Building Owner. They may prefer to appoint their own Surveyor. In most cases the fee for the Adjoining Owner’s Surveyor will be borne by the Building Owner.

6. Once appointed the Agreed Surveyor or Surveyors should then work to draw up a Party Wall Award. A Party Wall Award is the framework whereby works affecting the party structure are to be executed. A condition survey of the Adjoining Owner’s property will be undertaken. Once the Party Wall Award is agreed and published works can commence from the date stated within the Award.