Comprehensive Specification and Schedule of Works for a West London Block of Flats

A rooftop of a block of flats in London

RMA Surveyors has recently prepared a detailed specification and schedule of works for a block of purpose-built flats in West London. Acting on behalf of a managing agent, this project addresses essential maintenance, overdue repairs, and security improvements to enhance the property and meet compliance obligations. Following a thorough consultation process, the works have progressed to the tender stage, with completion anticipated in the spring of 2024.

Scope of Works

The schedule of works involves a wide range of critical maintenance and improvement tasks, including:

  • External Redecoration: Protecting and enhancing the building’s exterior to improve its appearance and resistance to environmental wear.
  • Roof Repairs: Addressing damage to ensure the roof is watertight and structurally sound.
  • Window Repairs: Restoring functionality and integrity by repairing deteriorated elements, including resealing mastic joints.
  • Security Upgrades: Installing external security gates and improving overall access control to restrict unauthorized entry into insecure areas.
  • Water Tank Replacement: Upgrading the existing water storage system to ensure compliance with modern standards and reliable operation.
  • Overall Building Maintenance: Undertaking improvements to neglected elements of the building to bring it back to an acceptable standard of repair and presentation.

The extensive nature of these works has arisen due to the accumulation of deferred maintenance over several years. When routine maintenance is postponed, minor issues can escalate, leading to a more extensive and costly scope of work.

Addressing Cost Concerns

A block of purpose built flats in London.

Leaseholders are often surprised by the expenses associated with such large-scale works. This is particularly true for properties requiring scaffolding, which incurs substantial costs. To achieve cost efficiency, RMA Surveyors recommends that clients coordinate all required high-level repairs simultaneously while scaffolding is in place. This approach minimizes future disruption and avoids repeated scaffolding expenses.

In this project, the managing agent and RMA Surveyors worked together to provide an estimated cost of the required works and are guiding the client through the Section 20 consultation process. Once approved, the schedule will allow for all critical tasks to be completed in a single, cohesive programme, ensuring efficiency and comprehensive coverage of the building’s needs.

Freeholder Obligations and Service Charge Planning

Freeholders are obligated to maintain the common parts and exterior of the building, with associated costs typically passed on to leaseholders through the service charge. Effective long-term planning, including the establishment of a sinking fund, can mitigate the financial burden on leaseholders by spreading costs over time. However, in buildings where such funds are absent or underfunded, the costs of overdue repairs can be significant.

Proactive maintenance planning not only avoids such large expenditures but also preserves the property’s condition and value. Regular upkeep reduces the likelihood of complex repairs becoming necessary and provides a smoother experience for leaseholders when work is required.

Why RMA Surveyors?

RMA Surveyors has a proven track record of managing large-scale refurbishment and repair projects. With expertise in preparing detailed specifications, assisting clients through the Section 20 process, and coordinating works with reputable contractors, we deliver effective, high-quality solutions tailored to your building’s needs.

If you manage a property requiring professional oversight for major works, contact RMA Surveyors to discuss how we can assist in achieving the best outcomes for your project.

Further Reading and Resources

  1. Royal Institution of Chartered Surveyors (RICS): Information on RICS standards and professional guidance for property management.
  2. Section 20 Consultation Process: Learn more about the Section 20 process for managing agents and leaseholders.
  3. Association of Residential Managing Agents (ARMA): Best practices and advice for managing agents.
  4. Building Safety Fund Guidance: Information about government support for high-rise building improvements.