Listed Building Repairs

Wood Boring BeetleWe were privileged enough to undertake a building survey of a Grade II Listed building in Aldermaston. The property was built originally in the 1600’s with further extensions and additions added in the 1800’s and 1900’s. The original property comprised of a timber frame structure with facing brick work in fill panels, the later additions were formed in solid masonry construction.

The property had undergone extensive refurbishment during the 1800’s and the mid 1900’s and additional upgrading and repairs and addition of services had been undertaken more recently.

Many of the more recent repairs had not been undertaken in sympathy with the original construction. Most significantly many repairs had been undertaken using a cement mortar, where lime mortar would have been originally used.

The internal faces of the timber frame walls were lined with wattle and daub and we found evidence of fresh wood boring beetle damage to the wattles and staves where the wall had been exposed to prolonged high levels of damp. Gypsum plasters had been used internally, originally a lime plaster would have been used and evidence of which was visible where gypsum plaster was coming away from the wall. Modern gypsum plasters are less impervious than lime and earth plasters and gypsum is hygroscopic, meaning that it absorbs water from the air.

We also found damage to lintels buried within the wall which were also affected by damp and excessive vegetation to walls, some of which was growing through the walls. The walls had been rendered with a cement render, which was preventing evaporation from the wall and water was accumulating in the walls and allowing the structure to become saturated. The cement repointing was also having a similar affect and affecting the exposed timber within the wall.

Unfortunately these defects are extremely common with Listed Buildings where contractors and specifier’s who do not understand the performance of traditional buildings have undertaken repairs in good faith but have caused more extensive damage to the structure as a result.

Often such repairs can be more expensive to remediate as materials such as strong cement mortars can damage brick work when removed, leading to further work and repair.

If you have a Listed property, or you’re thinking about purchasing a Listed building, and would like some advice regarding appropriate remediation and repairs, please contact us on 01635 579208 or complete the form with any queries.

Asbestos Concerns

One common item we often raise in our building surveys and homebuyer reports is the potential for asbestos to be present in textured, decorative coatings, such as Artex to ceilings and wall surfaces internally.

Following guidance by the Health & Safety Executive (HSE) http://www.hse.gov.uk/asbestos/ and the Asbestos regulations, we have an obligation to make mention of potentially asbestos containing materials.

Asbestos encapsulated in textured, decorative coatings is often only in very small amounts and provides no risk, unless it is disturbed and the fibres become airborne.  Textured, decorative coatings installed after the year 2000 are unlikely to contain any asbestos, as the use of asbestos was prohibited after this date.

RMA Surveyors Ltd are not asbestos surveyors; however, we are trained to identify potential asbestos containing materials. We have also worked alongside licenced asbestos testing and removals contractors to identify the presence of asbestos and arrange for its safe removal.

It should be noted that just because asbestos is present in a material, does not mean that the material is inherently unsafe but it should be left undisturbed, to avoid the asbestos fibres becoming airborne, at which point they do become hazardous. Professional advice should be sought.

For information and advice regarding asbestos in textured, decorative finishes, further reading is available on the HSE website.

If you have any asbestos related queries that you would like to discuss with RMA Surveyors Ltd, please contact us on 01635 579208 or by completing our ‘Contact Us Today’ form.

Project Managers for Repairs

Project Management. Repair & Redec Block of FlatsRMA Surveyors Ltd acted as project managers for an external maintenance and repairs programme to a block of flats in Cockfosters, London.

The contract included roof repairs; including repairs to parapet walls and the repair of roof coverings, maintenance to external doors and windows; including repairs and redecoration, providing insulation to tank rooms located on the roof, internal plaster repairs to common areas and redecoration and masonry repairs; including crack stitching and repointing repairs to arches and lintels above openings.

The contract value was for £70,000; we provided specification, tendered the works and oversaw the works in two phases. Unfortunately the initial contractor went into liquidation between phases, so we were required to re-tender the works and oversee phase two using a different contractor.

We saw the work through to completion, awarded final certification and ensured the work was undertaken to a satisfactory standard.

If you require a project manager for any similar repairs, redecoration or refurbishment contracts, please contact us using the form below or call us on 01635 579208.

Contact Us

Fill in the below form to contact us today.

  • This field is for validation purposes and should be left unchanged.
  • If you are requesting a survey quotation please provide the address and postcode of the property.

Project Manager for Fire Reinstatement

Melted LightbulbRMA Surveyors Ltd have recently been instructed to act as project managers for the restoration of a fire damaged flat in West Ilsley, Berkshire.

The property has been significantly damaged by fire within a couple of rooms, while the rest of the property has been heavily damaged by residual smoke and water, where the fire was extinguished.

Our instruction required us to:

  • appoint and oversee the initial clean up and restoration – cleaning smoke residue, removing items such as white goods and furniture, cleaning surfaces and removing floor coverings and soft furnishings;
  • advise the client to have the electrical services isolated, as they had been badly damaged by the fire;
  • and draw up a specification and schedule of works to issue to tendering contractors.

Once a contractor has been selected, we will be responsible for overseeing the works through to completion. This will include regular site visits, liaison with the building contractor and the client, valuing and certifying works at key stages, liaising and reporting back to the loss adjustor and dealing with any ad hoc queries as required.

When works are completed we will certify and sign off the work. Works will be tendered and executed under the JCT Minor Works Contract. The fees for our appointment as project managers are covered by the insurance policy.

Appointing a project manager can help to reduce the stress that such potentially distressing situations can cause. As Chartered Surveyors, acting as project managers, we are able to use our professional knowledge and expertise in order to facilitate a swift and effective remediation process.

RMA Surveyors Ltd are highly experienced in insurance reinstatement work and as such we provide a service that is cost effective in regards to managing spend for the insurance claim and one that gives the client peace of mind that the project is being overseen and undertaken by professionals.

If you have been affected by fire, flood or other insured risk, please contact us on 01635 579208 or by completing the form below.

Contact Us

Fill in the below form to contact us today.

  • This field is for validation purposes and should be left unchanged.
  • If you are requesting a survey quotation please provide the address and postcode of the property.

Issuing Party Wall Notification

Terraced housingWe were recently instructed to act as Party Wall Surveyors in Pangbourne. We were acting on behalf of the building owner to issue party wall notices to two adjoining owners on a Victorian Terrace.

Our client had already approached their neighbours and explained to them the works to be undertaken, then requested we issue formal notification of works to them.

Sometimes, as in this case where there is more than one adjoining owner, party wall notification can be more complicated. It is our role to determine who has an interest in the adjoining properties and which are the correct notices to serve under the Party Wall Etc Act 1996.

Our client had quite a tight deadline in which they wanted the Party Wall Agreements to be in place, as their appointed building contractor had an extremely busy schedule. So we acted efficiently and effectively to ensure everything was in place.

If you would like any advice regarding the Party Wall Etc Act 1996, please contact us on 01635 579 208, or complete the form below with your enquiry.

For further reading on Party Walls read our Understanding a Party Wall page.

Contact Us

Fill in the below form to contact us today.

  • This field is for validation purposes and should be left unchanged.
  • If you are requesting a survey quotation please provide the address and postcode of the property.

Project Management on Property Extensions and Refurbishments

An old Pumping Station for rennovationIt is frequently seen on self build tv programmes when the building owner dispenses with their professional team and announces they are going to take on the role of the project manager.

Often with little or no experience. Generally the end result is unsatisfactory, with conflicts with the building contractor, a lack of technical understanding, projects going over budget or well beyond the contract period, contractors not getting paid, legal disputes and all manner of stress to everyday life.

In short being a project manager is hard work. So why not let a professional help – in the long term, it will save you money, time, stress and heartache.

How can a professional help?
By enlisting the services of a Chartered Building Surveyor you will receive guidance and knowledge that will help your project to run smoothly. You’ll receive no nasty surprises and the outcome will be a refurbishment, extension or renovation that will be an asset.

RMA Surveyors Ltd will act on your behalf to specify, design and manage the building works. In addition to certifying works, assessing costs and liaising with the building contractor at every stage. We will use our professional skill, expertise and understanding of buildings and construction to administer and manage building contracts. We will supervise the building contract to ensure a smooth running of the project and a satisfactory outcome for all involved.

The Process
Once a project (e.g. a refurbishment, extension or reinstatement) has been designed and specified, we begin the process of procurement, usually via competitive tender. We issue the tender documents to several building contractors, who provide a quote for the works. Once tenders are received, we make a recommendation as to which building contractor should be appointed. We ensure you have the best building contractor for the job, at the best price.

We then manage the construction phase of the project, chairing regular on-site meetings, dealing with any issues as they arise, valuing works and certifying stage payments, as well as monitoring the overall quality of the build.

Finally, we certificate works when they have been satisfactorily completed and ensure any outstanding issues are dealt with after completion.

For further information on whether RMA Surveyors Ltd can help with your project, give us a call on 01635 579208. See our project management page for further details.

5 Steps to Recover from Flood Damage | Expert Surveyor Advice

RICS Guide to flooding

Flooding can be a devastating experience, leaving property owners overwhelmed and unsure of where to begin. Whether caused by natural disasters, burst pipes, or blocked drains, quick action is essential to minimize damage and protect your home or business. Follow these 5 expert-recommended steps to recover from flood damage effectively.

Step 1: Ensure Safety First

Before entering your property, prioritize safety. Floodwaters can hide hazards such as electrical risks, structural damage, or contamination. Contact professionals if you suspect severe structural issues.

Learn about our Structural Damage Surveys for peace of mind.

Step 2: Document the Damage

Accurate documentation is crucial for insurance claims. Take clear photographs and videos of the affected areas, including damaged walls, floors, furniture, and appliances.

Keep a detailed inventory of damaged items, including receipts if available.

Discover our Insurance Claims Assistance Services to streamline your claims process.

Step 3: Remove Water and Begin Drying

A flooded house.

Removing standing water and drying out the property quickly can prevent further damage and mold growth. Use pumps, wet vacuums, and dehumidifiers to dry the space. Ventilate the area by opening windows and doors if possible.

Be cautious of hidden water in cavities like walls and floors, which may require professional assessment.

Explore our Moisture and Mold Inspection Services for thorough evaluations.

Step 4: Clean and Disinfect

Floodwaters often contain contaminants like sewage or chemicals. Clean all surfaces with disinfectants and discard items that cannot be safely cleaned, such as carpets and mattresses.

Wear protective gloves and masks while cleaning to avoid exposure to harmful substances.

Read our guide on Post-Flood Cleaning and Restoration for expert tips.

Step 5: Assess Repairs and Plan Restoration

After cleaning, assess the extent of repairs needed. Engage a qualified surveyor to evaluate structural integrity, recommend repairs, and provide guidance on restoration.

Use this opportunity to implement flood-resistant measures like raised electrical outlets or waterproof flooring.

Contact us to schedule a Flood Damage Survey and start your restoration process.

Bonus Tips for Preventing Future Flood Damage

Install sump pumps or flood barriers. Maintain gutters and drains to avoid blockages. Consider flood insurance for better financial protection.

Learn more about Flood Protection Strategies.

How RMA Surveyors Can Help

Recovering from flood damage can be overwhelming, but you don’t have to face it alone. At RMA Surveyors, we offer professional flood damage surveys, structural assessments, and insurance claim support to guide you every step of the way.

Call to Action

If you’ve experienced flood damage, contact RMA Surveyors today for expert advice and personalized solutions. Get in touch to protect your property and start your recovery process with confidence.. If you need the assistance of a qualified and experienced Chartered Building Surveyor please call on 01635 579 208 or contact us via our contact page.

Protect your home against flooding

IMG_0810This is the advise being given to residents across Berkshire.

The Met Office has issued a yellow warning for rain in the district today (Wednesday), with 15-25mm of rain expected to fall within the yellow zone between 9am and 9pm.

There is also a yellow warning for wind in place between 10am today and 3am on Thursday. For more information visit: http://www.newburytoday.co.uk/2014/more-rain-to-fall-in-west-berkshire-tomorrow

If your home has been affected by the floods or water damage, call RMA Surveyors Ltd for advice.

How do you know if the Party Wall Act etc 1996 applies to works?

New structure adjoining older structureIf you are planning on undertaking building works the Party Wall etc Act 1996 may apply. If you do not know of a requirement to serve or respond to notices you are not alone and we can help.

Many people are unaware of their obligations and rights that the Party Wall Act provides. Building works that proceed without complying with the Act can lead to significant difficulties, legal action, and a breakdown in neighbourly relations. Iit is not just building works directly affecting a party wall or boundary wall that may require action under the Act.

A Building Owner may decide to build a permanent structure on his own land within 6 meters of a neighboring party structure, build near or on a boundary or cut into or otherwise alter an existing party wall. In all these cases the Party Wall Act can apply. The Act allows for a Building owner to progress with works whilst protecting the an Adjoining Owners’ interests.

Where an Adjoining owner has concerns regarding a neighbors’ proposals they can appoint an independent party wall surveyor to provide help and explain the implications and procedures of the Act.

The requirements of the act stipulate that where there is a disagreement, a Party wall surveyor can step in to guide the process according to a defined protocol. Anyone can act as a Party Wall Surveyor. However a surveyor should ideally be experienced in construction,  have read, understood and be able to operate within the Act, interpret technical details, drawings and ultimately work diplomatically to provide swift resolution.